Transporting 14 Heavy Drums: Safe Delivery from Germany to Turkmenistan Without Delays
Task
The client needed to transport 14 drum halves intended for a mine skip hoist installation from Germany to Turkmenistan. Each unit weighed between 33 and 36 tonnes and featured non-standard dimensions. The primary challenge was ensuring safe transportation across multiple countries while meeting a strict delivery schedule required for a major industrial project.
Project Overview
- Oversized cargo weighing up to 36 tonnes per unit.
- A complex supply chain spanning seven countries.
- Combined road and rail transport.
- Coordination with the railway administrations of multiple countries.
Our Solution
To ensure the successful execution of the project, BGT Group developed a comprehensive multimodal transport solution.
We:
- organised road transport from Germany to the rail terminal in Siemianówka, Poland, using specialist transport platforms;
- carried out crane-assisted transshipment onto broad-gauge railway wagons for onward rail transport;
- designed and obtained approval for customised cargo loading and securing plans in cooperation with Belarusian Railways;
- manufactured bespoke wooden support structures for each drum to maximise stability and protect the cargo throughout the journey;
- assumed full responsibility for transport documentation, route approvals, and 24/7 shipment monitoring.
Results for the Client
- The delivery was completed on schedule, ensuring the equipment arrived in line with the project's installation timeline.
- 100% cargo safety was achieved through customised securing systems and additional protective measures.
- Comprehensive project coordination minimised operational risks and eliminated unnecessary downtime, allowing the client to focus on the industrial installation.
- Careful transport planning and the optimal selection of transport modes helped reduce overall logistics costs.